Project Completion Certificate (Ground Water)
Scheme ID: 20016639 Name of Scheme: KARAUNDI GP WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2400 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 10-Aug-2023 Actual Date of Completion (Capex): 24-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 18/95.3 KARAUNDI 26.380569 83.733887
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT-PUMP 850/43 KARAUNDI 26.380569 83.733887
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 KARAUNDI 26.38063 83.733957
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE (K9) 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE 63 6.986
2 HDPE PIPE 75 0.9297
3 HDPE PIPE 90 0.5191
4 HDPE PIPE 110 0.3197
5 HDPE PIPE 125 0.2155
6 HDPE PIPE 140 0.1475
7 HDPE PIPE 160 0.013
HSC Connection
Sno. Total Nos.
1 380
Other Details
1.79
1.79
1.87
24-Jun-2023
15-Dec-2024