Project Completion Certificate (Ground Water)
Scheme ID: 20016844 Name of Scheme: Fareedapur No. of Villages: 1 No. of Habitation Covered: 7
Total Population Covered: 3973 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Mar-2023 Actual Date of Completion (Capex): 15-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.01 M/ 125.87 M Fareedapur 27.242348 80.201148
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1.400 M³ per Min /45Mtr Fareedapur 27.242348 80.201148
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 400 KL/ 20 Mtr Fareedapur 27.241822 80.201322
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D. I. Pipe 200 0.02414
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6, Class PE-100 63 4.4852
2 HDPE Pipe PN-6, Class PE-100 75 3.7749
3 HDPE Pipe PN-6, Class PE-100 90 4.1749
4 HDPE Pipe PN-6, Class PE-100 110 1.7612
5 HDPE Pipe PN-6, Class PE-100 125 1.7002
6 HDPE Pipe PN-6, Class PE-100 140 1.122
7 HDPE Pipe PN-6, Class PE-100 180 1.4688
8 HDPE Pipe PN-6, Class PE-100 200 0.291
HSC Connection
Sno. Total Nos.
1 895
Other Details
5.05
0.00
4.71
14-Mar-2024
24-Dec-2024