| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20016936 | Name of Scheme: AASSAA | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3815 | Base Year: 2021 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 05-Feb-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 30.32 Mtr / 99.54 Mtr | ASSA | 29.178202 | 77.920589 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 750 LPM / 50 Mtr | ASSA | 29.178202 | 77.920589 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 225 Kl / 12 M | ASSA | 29.178202 | 77.920589 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI | 150 | 0.0114 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 5.614 | |
| 2 | HDPE | 90 | 0.328 | |
| 3 | HDPE | 110 | 0.107 | |
| 4 | HDPE | 125 | 0.083 | |
| 5 | HDPE | 140 | 0.144 | |
| 6 | HDPE | 160 | 0.408 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 655 |