Project Completion Certificate (Ground Water)
Scheme ID: 20017058 Name of Scheme: Bahadarpur Sharfuddin Husain Water Supply No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3393 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Nov-2023 Actual Date of Completion (Capex): 12-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 24.02 MTR / 114.12 MTR BAHADURPUR SARFFUDDIN 29.517155 78.166887
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 775 LPM / 40 MTR BAHADURPUR SARFFUDDIN 29.517155 78.166887
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250 KL / 12 MTR BAHADURPUR SARFFUDDIN 29.51714 78.166994
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-06 CLASS PE-100 140 0.184
2 HDPE PIPE PN-06 CLASS PE-100 110 0.369
3 HDPE PIPE PN-06 CLASS PE-100 90 0.967
4 HDPE PIPE PN-06 CLASS PE-100 75 0.414
5 HDPE PIPE PN-06 CLASS PE-100 63 6.221
HSC Connection
Sno. Total Nos.
1 544
Other Details
2.37
2.05
2.11
12-Mar-2025
13-Mar-2025