Project Completion Certificate (Ground Water)
Scheme ID: 20017095 Name of Scheme: Nihutha No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1460 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 05-Feb-2022 Actual Date of Completion (Capex): 04-Feb-2022
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 12.07 / 262.72 Nihutha 26.502269 80.159231
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 23.30 / 57 Nihutha 26.502269 80.159231
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100/12 Nihutha 26.502269 80.159231
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 19
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2383.30
2 HDPE 75 320.80
3 HDPE 90 94.20
4 HDPE 125 565
HSC Connection
Sno. Total Nos.
1 281
Other Details
1.25
1.58
1.58
31-Jan-2024
01-Feb-2024