| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20017102 | Name of Scheme: Naglan Nensi Bila Ahatmali water Supply | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2081 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 02-Nov-2023 | Actual Date of Completion (Capex): 22-Nov-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tube Well | 15 M/135 | Naglan Nensi BA | 29.380189 | 78.500322 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible Pump 10 HP | 500 LPM /42 M | Naglan Nensi BA | 29.380189 | 78.500322 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150 KL / 12 M | Naglan Nensi BA | 29.380307 | 78.500111 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 100 | 0.046 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE PIPE PN-6 Class PE-100 | 63 | 3.20 | |
| 2 | HDPE PIPE PN-6 Class PE-100 | 75 | 0.24 | |
| 3 | HDPE PIPE PN-6 Class PE-100 | 90 | 0.09 | |
| 4 | HDPE PIPE PN-6 Class PE-100 | 110 | 0.037 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 388 |