Project Completion Certificate (Ground Water)
Scheme ID: 20017102 Name of Scheme: Naglan Nensi Bila Ahatmali water Supply No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2081 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-Nov-2023 Actual Date of Completion (Capex): 22-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 15 M/135 Naglan Nensi BA 29.380189 78.500322
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 10 HP 500 LPM /42 M Naglan Nensi BA 29.380189 78.500322
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL / 12 M Naglan Nensi BA 29.380307 78.500111
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.046
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 Class PE-100 63 3.20
2 HDPE PIPE PN-6 Class PE-100 75 0.24
3 HDPE PIPE PN-6 Class PE-100 90 0.09
4 HDPE PIPE PN-6 Class PE-100 110 0.037
HSC Connection
Sno. Total Nos.
1 388
Other Details
1.60
1.60
1.60
26-May-2024
27-May-2024