Project Completion Certificate (Ground Water)
Scheme ID: 20017182 Name of Scheme: HASANPUR PALKI WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1159 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 10-Feb-2022 Actual Date of Completion (Capex): 07-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 12.03 Mt / 138.10 Mtr Hasanpur Palki 29.250652 78.567451
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 7.50 HP 350LPM / 42 Mtr Hasanpur Palki 29.250652 78.567451
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100 KL /12.00 mtr Hasanpur Palki 29.250652 78.567451
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI Pipe 100 0.024
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6 Class 90 0.410
2 HDPE Pipe PN-6 Class 75 3.581
3 HDPE Pipe PN-6 Class 63 0.027
HSC Connection
Sno. Total Nos.
1 202
Other Details
1.30
1.30
1.30
05-Jun-2024
06-Jun-2024