Project Completion Certificate (Ground Water)
Scheme ID: 20017184 Name of Scheme: AKBARABAD JJM SCHEME No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 4105 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 09-Apr-2023 Actual Date of Completion (Capex): 10-Jun-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 36m / 110.8 M AKBARABAD 28.028718 80.199731
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 900LPM / 45M AKBARABAD 28.028718 80.199731
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 KL/ 15 M AKBARABAD 28.028718 80.199731
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe ?-7 150 0.0291
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 200 0.8863
2 HDPE Pipe PN-6: Class PE-100 160 1.5682
3 HDPE Pipe PN-6: Class PE-100 140 0.4858
4 HDPE Pipe PN-6: Class PE-100 110 0.1389
5 HDPE Pipe PN-6: Class PE-100 90 0.4726
6 HDPE Pipe PN-6: Class PE-100 75 1.254
7 HDPE Pipe PN-6: Class PE-100 63 8.0634
HSC Connection
Sno. Total Nos.
1 890
Other Details
2.56
2.86
2.86
31-Jan-2024
19-Nov-2024