Project Completion Certificate (Ground Water)
Scheme ID: 20017188 Name of Scheme: PIPRA MARORA JJM SCHEME No. of Villages: 3 No. of Habitation Covered: 7
Total Population Covered: 4765 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 09-Apr-2023 Actual Date of Completion (Capex): 25-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 30 M / 114.8M PIPRA MARORA 28.022098 80.77197
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersable 1050 LPM / 44 M PIPRA MARORA 28.022098 80.77197
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300KL/ 15M PIPRA MARORA 28.022098 80.77197
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. Pipe ?-7 150 0.0305
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 200 0.015
2 HDPE Pipe PN-6: Class PE-100 160 0.465
3 HDPE Pipe PN-6: Class PE-100 140 1.512
4 HDPE Pipe PN-6: Class PE-100 110 0.257
5 HDPE Pipe PN-6: Class PE-100 90 1.364
6 HDPE Pipe PN-6: Class PE-100 75 1.066
7 HDPE Pipe PN-6: Class PE-100 63 20.3025
HSC Connection
Sno. Total Nos.
1 549
Other Details
2.95
3.15
3.15
25-Sep-2024
19-Nov-2024