Project Completion Certificate (Ground Water)
Scheme ID: 20017397 Name of Scheme: BADHYA FULWARIA GP WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3400 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 02-May-2023 Actual Date of Completion (Capex): 24-Mar-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24/82.32 Badhya Fulwariya 26.354196 83.782547
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT pump 700/45 Badhya Fulwariya 26.354196 83.782547
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT-1 200KL/16M Badhya Fulwariya 26.360200 83.736500
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI PIPE(K9) 150 40
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe 63 6635.1
2 HDPE Pipe 75 980.5
3 HDPE Pipe 90 1080.8
4 HDPE Pipe 110 455.7
5 HDPE Pipe 125 885.4
6 HDPE Pipe 140 0
7 HDPE Pipe 160 346
8 HDPE Pipe 180 0
9 HDPE Pipe 200 0
10 HDPE Pipe 250 0
11 HDPE Pipe 300 0
HSC Connection
Sno. Total Nos.
1 560
Other Details
21922000.00
21491995.56
21820826.92
24-Jun-2023
01-Apr-2025