| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20017652 | Name of Scheme: Aurangabad dateri PWS scheme | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3251 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 27-Mar-2022 | Actual Date of Completion (Capex): 31-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 21/86 | aurangabad dateri | 28.733254 | 77.643816 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 450/52 | aurangabad dateri | 28.733254 | 77.643816 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/12 | aurangabad dateri | 28.733254 | 77.643816 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I | 100 | .023 | 100% work done |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 4.147 | |
| 2 | HDPE | 75 | .533 | |
| 3 | HDPE | 90 | .277 | 100% work done |
| 4 | HDPE | 110 | .141 | 100% work done |
| 5 | HDPE | 125 | .037 | 100% work done |
| 6 | HDPE | 140 | .357 | 100% work done |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 443 |