Project Completion Certificate (Ground Water)
Scheme ID: 20017813 Name of Scheme: AMANULLAPUR URF MAHARA No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4770 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 20-Mar-2023 Actual Date of Completion (Capex): 30-Apr-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/66 amanullapur urf mahara 28.246666 77.674191
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 350/45 amanullapur urf mahara 28.246666 77.674191
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 75/12 amanullapur urf mahara 28.246666 77.674191
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 19 100% WORK DONE
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.856 100% WORK DONE
2 HDPE 75 0.316 100% WORK DONE
3 HDPE 90 0.152 100% WORK DONE
4 HDPE 110 0.134 100% WORK DONE
5 HDPE 140 0.780 100% WORK DONE
6 HDPE 180 0.456 100% WORK DONE
HSC Connection
Sno. Total Nos.
Other Details
1.72
1.74
1.74
31-Oct-2024
01-Nov-2024