Project Completion Certificate (Ground Water)
Scheme ID: 20017819 Name of Scheme: MOHBALIPUR VILLAGE WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1663 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 20-Mar-2023 Actual Date of Completion (Capex): 30-Mar-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 0.017
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 8.027
2 HDPE 75 0.318
3 HDPE 90 0.147
4 110 110 0.072
5 HDPE 125 0.041
6 HDPE 140 0.048
7 HDPE 180 0.206
HSC Connection
Sno. Total Nos.
1 373
Other Details
1.87
1.87
1.87
30-Mar-2024
01-Apr-2024