| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20017926 | Name of Scheme: BANIA HARI CHITTAURA PWS | No. of Villages: 1 | No. of Habitation Covered: 6 |
| Total Population Covered: 3610 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2025 | Actual Date of Completion (Capex): 16-Oct-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 21/252.5 | BANIA HARI | 21.512061 | 81.739557 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump | 27/39 | BANIA HARI | 21.512061 | 81.739557 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 125/16 | BANIA HARI | 21.512047 | 81.739634 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6; Class PE-100 | 63 | 5.619 | |
| 2 | HDPE Pipe PN-6; Class PE-100 | 75 | 2.785 | |
| 3 | HDPE Pipe PN-6; Class PE-100 | 90 | 0.576 | |
| 4 | HDPE Pipe PN-6; Class PE-100 | 110 | 0.014 | |
| 5 | HDPE Pipe PN-6; Class PE-100 | 125 | 0.265 | |
| 6 | HDPE Pipe PN-6; Class PE-100 | 140 | 0.253 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | RISING MAIN/DI-K7 | 150 | 0.0277 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 390 |