Scheme ID: 20017965 Name of Scheme: Rampur W/S No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2340 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 06-Jul-2024 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 20.06/79.44 RAMPUR 28.010474 79.852241
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP - 1 30.96/45 RAMPUR 28.010474 79.852241
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 150/16 RAMPUR 28.010581 79.852091
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 100 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 8.262
2 HDPE / 6KG 90 0.090
3 HDPE / 6KG 140 3.158
4 HDPE / 6KG 160 0.015
HSC Connection
Sno. Total Nos.
1 422
Other Details
2.23
0.00
2.23
05-Oct-2024
06-Dec-2024