| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20017995 | Name of Scheme: dolapur | No. of Villages: 4 | No. of Habitation Covered: 4 |
| Total Population Covered: 2790 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 30-Nov-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 24.05/85.24 | DOLAPUR | 27.760092 | 79.651351 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT Pump - 1 | 35.28 M3 / 47 M | DOLAPUR | 27.760092 | 79.651351 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT - 1 | 175 KL - 16 M | DOLAPUR | 27.760188 | 79.651155 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI - K7 | 125 | 0.030 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE /6KG | 63 | 7.225 | |
| 2 | HDPE /6KG | 75 | 1.163 | |
| 3 | HDPE /6KG | 90 | 0.469 | |
| 4 | HDPE /6KG | 110 | 1.669 | |
| 5 | HDPE /6KG | 140 | 0.325 | |
| 6 | HDPE /6KG | 160 | 0.025 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 480 |