Project Completion Certificate (Ground Water)
Scheme ID: 20017995 Name of Scheme: dolapur No. of Villages: 4 No. of Habitation Covered: 4
Total Population Covered: 2790 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 30-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 24.05/85.24 DOLAPUR 27.760092 79.651351
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Pump - 1 35.28 M3 / 47 M DOLAPUR 27.760092 79.651351
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 175 KL - 16 M DOLAPUR 27.760188 79.651155
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI - K7 125 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE /6KG 63 7.225
2 HDPE /6KG 75 1.163
3 HDPE /6KG 90 0.469
4 HDPE /6KG 110 1.669
5 HDPE /6KG 140 0.325
6 HDPE /6KG 160 0.025
HSC Connection
Sno. Total Nos.
1 480
Other Details
2.33
0.00
2.33
29-Feb-2024
06-Dec-2024