Project Completion Certificate (Ground Water)
Scheme ID: 20018013 Name of Scheme: Sahora No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2910 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 09-Aug-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 27.14/91.25 SAHORA 28.094446 79.985943
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 38.52/43 SAHORA 28.094446 79.985943
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 200/12 SAHORA 28.094453 79.985761
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 125 0.0295
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 2.864
2 HDPE/6KG 75 0.345
3 HDPE/6KG 90 1.023
4 HDPE/6KG 110 1.095
5 HDPE/6KG 140 0.118
6 HDPE/6KG 160 0.815
HSC Connection
Sno. Total Nos.
1 451
Other Details
2.18
0.00
2.18
08-Nov-2023
06-Dec-2024