| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20018235 | Name of Scheme: Mahmoodpur Lalta | No. of Villages: 2 | No. of Habitation Covered: 3 |
| Total Population Covered: 2156 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 29-Apr-2023 | Actual Date of Completion (Capex): 12-Oct-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewells | 24.05Mtr/ 79.79Mtr | Mahmoodpur Lalta | 26.973957 | 80.366858 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 0.5 M³ per Min /45Mtr | Mahmoodpur Lalta | 26.973957 | 80.366858 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 150KL/ 18Mtr | Mahmoodpur Lalta | 26.97385 | 80.367098 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I Pipe | 150 | 0.0148 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6, PE-100 | 63 | 3.209 | |
| 2 | HDPE Pipe PN-6, PE-100 | 75 | 1.151 | |
| 3 | HDPE Pipe PN-6, PE-100 | 90 | 5.272 | |
| 4 | HDPE Pipe PN-6, PE-100 | 110 | 0.054 | |
| 5 | HDPE Pipe PN-6, PE-100 | 125 | 0.344 | |
| 6 | HDPE Pipe PN-6, PE-100 | 140 | 0.205 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 169 |