Project Completion Certificate (Ground Water)
Scheme ID: 20018248 Name of Scheme: Gajipur Water Supply Scheme No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3256 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Jan-2025 Actual Date of Completion (Capex): 26-Jan-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 100 0.023
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 3.11
2 HDPE PIPE PN -6: CLASS PE -100 75 0.35
3 HDPE PIPE PN -6: CLASS PE -100 90 0.28
4 HDPE PIPE PN -6: CLASS PE -100 110 0.12
HSC Connection
Sno. Total Nos.
Other Details
1.70
1.70
1.70
26-Jan-2025
27-Jan-2025