Project Completion Certificate (Ground Water)
Scheme ID: 20018283 Name of Scheme: BIBIPUR WSS No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1920 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 15-Aug-2023 Actual Date of Completion (Capex): 03-May-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.18/114.94 Bibipur 29.436005 77.729273
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 450/50 Bibipur 29.436005 77.729273
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 Bibipur 29.436005 77.729273
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.0164
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 2951.34
2 HDPE 75 325.6
3 HDPE 90 80.22
4 HDPE 110 54.91
5 HDPE 160 368.86
HSC Connection
Sno. Total Nos.
1 370
Other Details
1.69
0.00
1.62
05-Sep-2025
06-Sep-2025