Project Completion Certificate (Ground Water)
Scheme ID: 20018313 Name of Scheme: BIBIPUR W/S Scheme No. of Villages: 1 No. of Habitation Covered: 2
Total Population Covered: 1805 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 08-Mar-2023 Actual Date of Completion (Capex): 27-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200X150 MM TUBE WELL 18M / 121.07 M BIBIPUR 27.24249° 79.599116°
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 400 CUM / 51 BIBIPUR 27.24249° 79.599116°
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100 KL / 12 M STAGING BIBIPUR 27.24249° 79.599116°
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 80 .0196
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.1481
2 HDPE 75 .3947
3 HDPE 90 0.1446
4 HDPE 110 .0982
5 HDPE 140 .137
HSC Connection
Sno. Total Nos.
1 348
Other Details
1.89
1.89
1.89
27-Jun-2024
28-Jul-2025