Project Completion Certificate (Ground Water)
Scheme ID: 20018328 Name of Scheme: Sungarpur Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2083 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 10-Feb-2022 Actual Date of Completion (Capex): 26-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6: CLASS PE -100 63 6.69
2 HDPE PIPE PN -6: CLASS PE -100 75 0.47
3 HDPE PIPE PN -6: CLASS PE -100 90 0.14
4 HDPE PIPE PN -6: CLASS PE -100 110 0.14
5 HDPE PIPE PN -6: CLASS PE -100 125 0.03
6 HDPE PIPE PN -6: CLASS PE -100 140 0.91
HSC Connection
Sno. Total Nos.
Other Details
1.50
1.81
1.81
07-Nov-2024
08-Nov-2024