Project Completion Certificate (Ground Water)
Scheme ID: 20018334 Name of Scheme: Prempur Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2200 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 10-Feb-2024 Actual Date of Completion (Capex): 23-Nov-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 15 M/135 M PREMPUR 29.66574 78.311052
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSIBLE PUMP 10 HP 500 LPM /40 M PREMPUR 29.66574 78.311052
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL /14 M PREMPUR 29.665817 78.311209
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 100 0.018.90
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN -6 CLASS PE-100 63 3125.23
2 HDPE PIPE PN -6 CLASS PE-100 75 443.80
3 HDPE PIPE PN -6 CLASS PE-100 90 667.20
4 HDPE PIPE PN -6 CLASS PE-100 110 534.92
5 HDPE PIPE PN -6 CLASS PE-100 160 13
HSC Connection
Sno. Total Nos.
1 316
Other Details
1.73
1.73
1.73
27-May-2024
28-May-2024