| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20018478 | Name of Scheme: Guravava | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2820 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 20-Jul-2023 | Actual Date of Completion (Capex): 31-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELLS | 23.99/84.96 | GURGAVA | 27.695846 | 79.673159 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VP PUMP -1 | 34.92/45 | GURGAVA | 27.695846 | 79.673159 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT -1 | 175/16 | GURGAVA | 27.696011 | 79.673037 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | K-7 | 125 | 0.028 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE/6KG | 63 | 6.120 | |
| 2 | HDPE/6KG | 75 | 1.080 | |
| 3 | HDPE/6KG | 90 | 0.179 | |
| 4 | HDPE/6KG | 110 | 0.347 | |
| 5 | HDPE/6KG | 140 | 0.408 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 568 |