Project Completion Certificate (Ground Water)
Scheme ID: 20018568 Name of Scheme: TIKARI No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 1910 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-Feb-2023 Actual Date of Completion (Capex): 18-Apr-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 150 Tikari 26.414904 83.445571
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submercible Pump 400 LPM/ 43m head Tikari 26.414904 83.445571
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 ESR 100 KL/ 13m Tikari 26.414904 83.445571
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 7.742
2 HDPE 75 0.561
3 HDPE 90 0.26
4 HDPE 110 0.904
5 HDPE 140 0.045
HSC Connection
Sno. Total Nos.
1 331
Other Details
2.46
0.00
2.41
18-Jul-2023
19-Nov-2024