| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20018966 | Name of Scheme: HIRDAYPUR MADAULA PWS SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 3100 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 27-Aug-2021 | Actual Date of Completion (Capex): 31-Oct-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 59.37/23.1 | hirdhaypur mandhola | 28.853 | 77.6284 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 500/51 | hirdhaypur mandhola | 28.853 | 77.6284 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 150/12 | hirdhaypur mandhola | 28.853 | 77.6284 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I | 100 | 0.021 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.412 | |
| 2 | HDPE | 75 | .248 | |
| 3 | HDPE | 90 | .308 | |
| 4 | HDPE | 110 | .147 | |
| 5 | HDPE | 125 | .074 | |
| 6 | HDPE | 140 | .082 | |
| 7 | HDPE | 160 | .078 | |
| 8 | HDPE | 200 | .067 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |