Project Completion Certificate (Ground Water)
Scheme ID: 20018966 Name of Scheme: HIRDAYPUR MADAULA PWS SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 3100 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 27-Aug-2021 Actual Date of Completion (Capex): 31-Oct-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 59.37/23.1 hirdhaypur mandhola 28.853 77.6284
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 500/51 hirdhaypur mandhola 28.853 77.6284
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150/12 hirdhaypur mandhola 28.853 77.6284
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I 100 0.021
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.412
2 HDPE 75 .248
3 HDPE 90 .308
4 HDPE 110 .147
5 HDPE 125 .074
6 HDPE 140 .082
7 HDPE 160 .078
8 HDPE 200 .067
HSC Connection
Sno. Total Nos.
Other Details
1.57
1.61
1.61
27-Mar-2025
01-Apr-2025