| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20019385 | Name of Scheme: Barkhrabad Urf Khatai Water Supply | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2059 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 09-Feb-2024 | Actual Date of Completion (Capex): 06-Apr-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 19.03/134.28 | Bakhrabad urf Khatai | 78.416968 | 29.189195 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submerssible Pump 10 HP | 350 /44 | Bakhrabad urf Khatai | 78.416968 | 29.189195 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 100/12 | Bakhrabad urf Khatai | 78.416968 | 29.189195 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D I K-7 Pipe | 100 | 24.50 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe ,PN-6 , PE-100 | 63 | 4.406 | |
| 2 | HDPE Pipe ,PN-6 , PE-100 | 75 | 0.236 | |
| 3 | HDPE Pipe ,PN-6 , PE-100 | 90 | 0.320 | |
| 4 | HDPE Pipe ,PN-6 , PE-100 | 125 | 0.240 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 257 |