Project Completion Certificate (Ground Water)
Scheme ID: 20019390 Name of Scheme: Bhareka Water Supply No. of Villages: 3 No. of Habitation Covered: 3
Total Population Covered: 2481 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 10-Feb-2024 Actual Date of Completion (Capex): 11-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18.06 MTR / 127.37 MTR BHAREKHA 29.522409 78.299199
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 SUBMERSILBE PUMP 12.50 HP 625 LPM / 44 MTR BHAREKHA 29.522409 78.299199
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175 KL / 12 MTR BHAREKHA 29.522508 78.299482
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 DI PIPE 125 0.022
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6 CLASS PE-100 140 0.275
2 HDPE PIPE PN-6 CLASS PE-100 125 0.536
3 HDPE PIPE PN-6 CLASS PE-100 90 1.897
4 HDPE PIPE PN-6 CLASS PE-100 75 0.186
5 HDPE PIPE PN-6 CLASS PE-100 63 5.186
HSC Connection
Sno. Total Nos.
1 501
Other Details
2.17
2.00
2.00
10-Jun-2024
11-Jun-2024