| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20019647 | Name of Scheme: ITAYIRA | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 2759 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Dec-2024 | Actual Date of Completion (Capex): 09-Mar-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Tubewell | 34.00 M / 99.20 M | Itayira | 28°53'19.1"N | 77°40'20.4"E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Submersible | 650 LPM / 50 M | Itayira | 28°53'19.1"N | 77°40'20.4"E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT-1 | 175 Kl / 14 M | Itayira | 28°53'19.1"N | 77°40'20.4"E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | D.I. | 150 | 0.016 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 2.768 | |
| 2 | HDPE | 90 | 0.265 | |
| 3 | HDPE | 110 | 0.198 | |
| 4 | HDPE | 140 | 0.382 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 486 |