Project Completion Certificate (Ground Water)
Scheme ID: 20019652 Name of Scheme: SALLIA No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 3340 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 02-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21/96.35 SALLIA 27.895797 79.969191
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP - 1 40.20/45 SALLIA 27.895797 79.969191
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT - 1 200/16 SALLIA 27.895677 79.969111
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 150 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 4.840
2 HDPE / 6KG 75 0.370
3 HDPE / 6KG 90 0.158
4 HDPE / 6KG 110 1.082
5 HDPE / 6KG 140 0.535
6 HDPE / 6KG 160 0.100
HSC Connection
Sno. Total Nos.
Other Details
2.43
0.00
2.43
02-Dec-2024
06-Dec-2024