Project Completion Certificate (Ground Water)
Scheme ID: 20019664 Name of Scheme: Bareng No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 2330 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 20-Sep-2023 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21/78.39 BARENG 27.726243 79.852844
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VP PUMP -1 28.8/41 BARENG 27.726243 79.852844
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 150/12 BARENG 27.726455 79.852627
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 100 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE/6KG 63 3.663
2 HDPE/6KG 75 0.418
3 HDPE/6KG 90 0.169
4 HDPE/6KG 110 0.142
5 HDPE/6KG 140 0.416
HSC Connection
Sno. Total Nos.
1 429
Other Details
1.73
0.00
1.72
30-Dec-2023
06-Dec-2024