Project Completion Certificate (Ground Water)
Scheme ID: 20019672 Name of Scheme: Dhakia Elaqua Parwaizpur No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2140 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 12-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 21/88.28 Dhakia Elaqua Parwaizpur 27.892061 79.816114
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP - 1 28.80/41 Dhakia Elaqua Parwaizpur 27.892061 79.816114
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT -1 150/12 Dhakia Elaqua Parwaizpur 27.892010 79.816236
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 100 0.030
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 3.996
2 HDPE / 6KG 75 0.845
3 HDPE / 6KG 90 0.275
4 HDPE / 6KG 110 0.704
5 HDPE / 6KG 140 0.098
HSC Connection
Sno. Total Nos.
1 445
Other Details
1.96
0.00
1.95
12-Jul-2024
16-Dec-2024