| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20019675 | Name of Scheme: Gowar Sanda | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2780 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 31-Aug-2023 | Actual Date of Completion (Capex): 31-Dec-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBEWELLS WITH SOLAR PLANT | 18 / 94.24 | Gowar Sanda | 27.927689 | 79.849596 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | SUBMERSIBLE PUMP | 550 / 41 | Gowar Sanda | 27.927586 | 79.849393 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC STRUCTURE WITH ZINCALUME WATER TANK | 150 / 12 | Gowar Sanda | 27.927715 | 79.849429 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI K-7 | 125 | 0.030 | Rising Main |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE / 6Kg | 63 | 4.215 | Distribution Network |
| 2 | HDPE / 6Kg | 75 | 0.270 | Distribution Network |
| 3 | HDPE / 6Kg | 90 | 0.110 | Distribution Network |
| 4 | HDPE / 6Kg | 110 | 0.194 | Distribution Network |
| 5 | HDPE / 6Kg | 140 | 0.330 | Distribution Network |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 491 |