Project Completion Certificate (Ground Water)
Scheme ID: 20019689 Name of Scheme: Niwadi No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 2950 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 04-Sep-2024 Actual Date of Completion (Capex): 31-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBEWELL 18/95.19 NIWADI 27.947605 79.870241
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT PUMP 1 38.40/45 NIWADI 27.947605 79.870241
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 1 175/16 NIWADI 27.947605 79.870105
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 K-7 125 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE / 6KG 63 6.611
2 HDPE / 6KG 75 0.688
3 HDPE / 6KG 90 0.585
4 HDPE / 6KG 110 0.768
5 HDPE / 6KG 140 0.681
6 HDPE / 6KG 160 0.095
HSC Connection
Sno. Total Nos.
1 480
Other Details
2.33
0.00
2.33
04-Dec-2024
06-Dec-2024