Project Completion Certificate (Ground Water)
Scheme ID: 20019746 Name of Scheme: Barsari No. of Villages: 1 No. of Habitation Covered: 12
Total Population Covered: 4640 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Aug-2023 Actual Date of Completion (Capex): 25-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell Assembly 35.08/47.41 BADSHARI 26.572242 82.51162
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Ac Submersible Pump 12.5 63/42 BADSHARI 26.572242 82.51162
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 300/12 BADSHARI 26.572294 82.511697
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 200 0.025
2 DI-K7 150 0.029
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE PIPE PN-6: Class PE-100 90 1.895
2 HDPE PIPE PN-6: Class PE-100 75 2.834
3 HDPE PIPE PN-6: Class PE-100 63 19.052
4 HDPE PIPE PN-6: Class PE-100 110 0.169
5 HDPE PIPE PN-6: Class PE-100 125 1.954
6 HDPE PIPE PN-6: Class PE-100 160 0.889
7 HDPE PIPE PN-6: Class PE-100 180 0.09
HSC Connection
Sno. Total Nos.
1 557
Other Details
3.54
3.54
3.51
31-Oct-2025
01-Nov-2025