| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20019768 | Name of Scheme: Harinathpur | No. of Villages: 3 | No. of Habitation Covered: 6 |
| Total Population Covered: 2480 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 03-Aug-2023 | Actual Date of Completion (Capex): 22-Jun-2023 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering of Tubewell Assembly | 21/114.8 | Silwat | 026°23'05.99016?N | 082°22'11.92455?E |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | AC Submersible Pump | 33/49 | Silwat | 026°23'05.99016?N | 082°22'11.92455?E |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 175/18 | Silwat | 026°23'05.13792?N | 082°22'12.01386?E |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 100 | 0.035 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE-PN6 | 63 | 8.632 | |
| 2 | HDPE-PN6 | 75 | 0.628 | |
| 3 | HDPE-PN6 | 90 | 0.939 | |
| 4 | HDPE-PN6 | 110 | 0.642 | |
| 5 | HDPE-PN6 | 140 | 0.797 | |
| 6 | HDPE-PN6 | 160 | 0.472 | |
| 7 | HDPE-PN6 | 180 | 0.157 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 340 |