Project Completion Certificate (Ground Water)
Scheme ID: 20019774 Name of Scheme: Bhikhpur Khurd No. of Villages: 3 No. of Habitation Covered: 13
Total Population Covered: 6270 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Aug-2023 Actual Date of Completion (Capex): 14-Aug-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well-1 24.16/79.84 Bhikhpur Khurd 26º 12' 10.2" N 82º 48' 26.798" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT Submersible Pump 39/46 Bhikhpur Khurd 26º 12' 10.2" N 26º 12' 10.2" N
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 8.042
2 HDPE Pipe PN-6: Class PE-100 75 5.900
3 HDPE Pipe PN-6: Class PE-100 90 1.859
4 HDPE Pipe PN-6: Class PE-100 110 0.911
5 HDPE Pipe PN-6: Class PE-100 140 1.113
6 HDPE Pipe PN-6: Class PE-100 160 0.242
7 HDPE Pipe PN-6: Class PE-100 160 0.418
HSC Connection
Sno. Total Nos.
1 340
Other Details
2.57
0.00
2.54
02-Dec-2024
03-Dec-2024