Project Completion Certificate (Ground Water)
Scheme ID: 20019789 Name of Scheme: Medhi Sulempur No. of Villages: 3 No. of Habitation Covered: 6
Total Population Covered: 4800 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Aug-2023 Actual Date of Completion (Capex): 10-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30/64.8 MEHDI SALEMPUR 26º 30' 30.1" N 82º 47' 32.26" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump-1 41.4/44 MEHDI SALEMPUR 26º 30' 30.1" N 82º 47' 32.26" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 200/14 MEHDI SALEMPUR 26º 30' 30.1" N 82º 47' 32.26" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 150 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 11.735
2 HDPE Pipe PN-6: Class PE-100 75 1.276
3 HDPE Pipe PN-6: Class PE-100 90 1.636
4 HDPE Pipe PN-6: Class PE-100 110 2.58
5 HDPE Pipe PN-6: Class PE-100 125 0.167
6 HDPE Pipe PN-6: Class PE-100 180 0.115
HSC Connection
Sno. Total Nos.
1 506
Other Details
2.54
0.00
2.50
19-Mar-2025
20-Mar-2025