| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20019810 | Name of Scheme: Pipri Mohammadi | No. of Villages: 2 | No. of Habitation Covered: 7 |
| Total Population Covered: 2053 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 03-Aug-2023 | Actual Date of Completion (Capex): 17-Feb-2025 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering of Tubewell Assembly | 62.94/68.81 | PIPRI MOHAMMADI | 26.5059 | 82.617347 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Ac Submersible Pump 12.5 HP | 36/47 | PIPRI MOHAMMADI | 26.5059 | 82.617347 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 175/16 | PIPRI MOHAMMADI | 26.505902 | 82.617357 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 150 | 0.022 | |
| 2 | DI-K7 | 100 | 0.018 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 90 | 1.068 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | 0.702 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 63 | 7.938 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 0.453 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 125 | 0.808 | |
| 6 | HDPE Pipe PN-6: Class PE-100 | 160 | 0.452 | |
| 7 | HDPE Pipe PN-6: Class PE-100 | 180 | 0.018 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 303 |