Project Completion Certificate (Ground Water)
Scheme ID: 20019810 Name of Scheme: Pipri Mohammadi No. of Villages: 2 No. of Habitation Covered: 7
Total Population Covered: 2053 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Aug-2023 Actual Date of Completion (Capex): 17-Feb-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Lowering of Tubewell Assembly 62.94/68.81 PIPRI MOHAMMADI 26.5059 82.617347
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Ac Submersible Pump 12.5 HP 36/47 PIPRI MOHAMMADI 26.5059 82.617347
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC 175/16 PIPRI MOHAMMADI 26.505902 82.617357
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 150 0.022
2 DI-K7 100 0.018
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 90 1.068
2 HDPE Pipe PN-6: Class PE-100 75 0.702
3 HDPE Pipe PN-6: Class PE-100 63 7.938
4 HDPE Pipe PN-6: Class PE-100 110 0.453
5 HDPE Pipe PN-6: Class PE-100 125 0.808
6 HDPE Pipe PN-6: Class PE-100 160 0.452
7 HDPE Pipe PN-6: Class PE-100 180 0.018
HSC Connection
Sno. Total Nos.
1 303
Other Details
2.22
2.22
2.20
17-May-2025
18-May-2025