Project Completion Certificate (Ground Water)
Scheme ID: 20019865 Name of Scheme: Gidahi water supply scheme No. of Villages: 2 No. of Habitation Covered: 2
Total Population Covered: 1990 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 20-Jul-2023 Actual Date of Completion (Capex): 01-Jun-0026
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 18/129.94 GIDAHI 26.6038 83.1858
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 27/45 GIDAHI 26.6038 83.1858
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 Overhead Tank-1 125/16 GIDAHI 26.6038 83.1858
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 100 0.015 Laying Completed
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4.73 Laying Completed
2 HDPE 75 0.06 Laying Completed
3 HDPE 90 0.15 Laying Completed
4 HDPE 110 0.45 Laying Completed
5 HDPE 140 0.66 Laying Completed
6 HDPE 160 0.65 Laying Completed
HSC Connection
Sno. Total Nos.
1 331
Other Details
1.78
0.00
1.78
12-May-2026
20-Jun-2026