Project Completion Certificate (Ground Water)
Scheme ID: 20019892 Name of Scheme: MALHEPUR PWS No. of Villages: 2 No. of Habitation Covered: 3
Total Population Covered: 2700 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 22-Sep-2023 Actual Date of Completion (Capex): 28-Dec-2022
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 21.03mtr/163.51mtr MALHEPUR 26.49945184* 79.5030715
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 59(M^3)/55mtr MALHEPUR 26.49945184 79.5030715
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 175KL/18mtr MALHEPUR 26.499469 79.503065
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 150 21
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 4425.5
2 HDPE 75 14
3 HDPE 90 673
4 HDPE 110 498
5 HDPE 160 54
HSC Connection
Sno. Total Nos.
1 540
Other Details
1.64
1.87
1.87
04-Apr-2023
05-Apr-2023