Project Completion Certificate (Ground Water)
Scheme ID: 20019894 Name of Scheme: KUSMARA PWS No. of Villages: 1 No. of Habitation Covered: 5
Total Population Covered: 2055 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 14-Sep-2022 Actual Date of Completion (Capex): 13-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 21.1 M / 54.26 M Kusmara 26.783813 79.453146
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible (41.46 M3/Hr.) / 46 M Kusmara 26.783813 79.453146
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 150 KL/ 16 M Kusmara 26.783814 79.453048
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 D.I. 100 0.019
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.903
2 HDPE 75 0.2
3 HDPE 90 2.483
4 HDPE 110 1.305
5 HDPE 140 1.083
HSC Connection
Sno. Total Nos.
1 385
Other Details
1.97
1.84
1.84
24-Jun-2024
25-Jun-2024