Project Completion Certificate (Ground Water)
Scheme ID: 20019920 Name of Scheme: Karamchand Pur W/S Scheme No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1724 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 26-Aug-2022 Actual Date of Completion (Capex): 10-Jun-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 200X150 MM TUBE WELL 15.03 / 110.52 KARAMCHANDPUR 27.263307° 79.49944°
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 400 CUM / 51 KARAMCHANDPUR 27.263307° 79.49944°
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100 KL / 12 M STAGING KARAMCHANDPUR 27.263307° 79.49944°
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 80 .0171
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 75 .0451
2 HDPE 90 .1825
3 HDPE 110 .171
4 HDPE 140 .3337
5 HDPE 63 3.0513
HSC Connection
Sno. Total Nos.
1 398
Other Details
1.77
1.77
1.77
15-May-2024
28-Jul-2025