Project Completion Certificate (Ground Water)
Scheme ID: 20019923 Name of Scheme: Lavaiya No. of Villages: 1 No. of Habitation Covered: 6
Total Population Covered: 2570 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Aug-2023 Actual Date of Completion (Capex): 23-Jun-2025
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube well 18.02 / 82.10 LAVAIYA 26º 18' 52.024" N 82º 48' 24.23" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump-1 30/43 LAVAIYA 26º 18' 52.024" N 82º 48' 24.23" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-Zink Alum Tank 150 / 12 LAVAIYA 26º 18' 52.024" N 82º 48' 24.23" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI Pipe K-7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 6.446
2 HDPE Pipe PN-6: Class PE-100 75 3.197
3 HDPE Pipe PN-6: Class PE-100 90 2.022
4 HDPE Pipe PN-6: Class PE-100 110 0.486
5 HDPE Pipe PN-6: Class PE-100 140 0.337
6 HDPE Pipe PN-6: Class PE-100 160 0.035
HSC Connection
Sno. Total Nos.
1 495
Other Details
2.03
0.00
2.02
14-Oct-2025
15-Oct-2025