| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20019933 | Name of Scheme: Bhasra | No. of Villages: 1 | No. of Habitation Covered: 2 |
| Total Population Covered: 2490 | Base Year: 2023 | Intermediate Year: 2038 | Design Year: 2053 |
| Date of Completion (As per Contract): 03-Aug-2023 | Actual Date of Completion (Capex): 25-Sep-2024 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | Lowering of Tubewell Assembly | 24/108.8 | Bhasra | 26.491352 | 82.667265 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | Ac Submersible Pump 10 HP | 550 LPM/43 Mtr. | Bhasra | 26.491352 | 82.667265 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | RCC | 150/12 | Bhasra | 26.491335 | 82.667338 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI-K7 | 100 | .035 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE Pipe PN-6: Class PE-100 | 63 | 4.743 | |
| 2 | HDPE Pipe PN-6: Class PE-100 | 75 | .529 | |
| 3 | HDPE Pipe PN-6: Class PE-100 | 90 | .517 | |
| 4 | HDPE Pipe PN-6: Class PE-100 | 110 | 1.606 | |
| 5 | HDPE Pipe PN-6: Class PE-100 | 140 | .0364 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 256 |