| Project Completion Certificate (Ground Water) | |||
|---|---|---|---|
| Scheme ID: 20019935 | Name of Scheme: GONAH SURATPURA GP WATER SUPPLY SCHEME | No. of Villages: 1 | No. of Habitation Covered: 1 |
| Total Population Covered: 1850 | Base Year: 2022 | Intermediate Year: 2037 | Design Year: 2052 |
| Date of Completion (As per Contract): 10-Aug-2023 | Actual Date of Completion (Capex): 23-Dec-2022 | ||
| Tubewells | |||||
|---|---|---|---|---|---|
| Sno. | Description | Depth of Strainer (m) / Depth of Plain Pipe (m) | Location | Latitude | Longitude |
| 1 | TUBE WELL | 12/79.79 | GONAH SURATPUR | 26.44917 | 83.574327 |
| Pumps | |||||
|---|---|---|---|---|---|
| Sno. | Type of Pump | Discharge (M³) / Head(Mtr.) | Location | Latitude | Longitude |
| 1 | VT-PUMP | 400/45 | GONAH SURATPUR | 26.44917 | 83.574327 |
| OHT's | |||||
|---|---|---|---|---|---|
| Sno. | Structure | Capacity (In KL) / Staging Ht.(Mtr.) | Location | Latitude | Longitude |
| 1 | OHT | 125/12 | GONAH SURATPUR | 26.44917 | 83.574327 |
| Clear Water Rising Main | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | DI / K9 | 100 | 0.04 | |
| Distribution Network | ||||
|---|---|---|---|---|
| Sno. | Pipe Type / Material | Dia (In mm.) | Length (In KM.) | Remarks |
| 1 | HDPE | 63 | 3.933 | |
| 2 | HDPE | 90 | 0.26111 | |
| 3 | HDPE | 110 | 0.40582 | |
| HSC Connection | |
|---|---|
| Sno. | Total Nos. |
| 1 | 272 |