Project Completion Certificate (Ground Water)
Scheme ID: 20019935 Name of Scheme: GONAH SURATPURA GP WATER SUPPLY SCHEME No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 1850 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 10-Aug-2023 Actual Date of Completion (Capex): 23-Dec-2022
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 TUBE WELL 12/79.79 GONAH SURATPUR 26.44917 83.574327
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VT-PUMP 400/45 GONAH SURATPUR 26.44917 83.574327
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 125/12 GONAH SURATPUR 26.44917 83.574327
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI / K9 100 0.04
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 3.933
2 HDPE 90 0.26111
3 HDPE 110 0.40582
HSC Connection
Sno. Total Nos.
1 272
Other Details
1.40
1.40
1.40
24-Jun-2023
01-Dec-2024