Project Completion Certificate (Ground Water)
Scheme ID: 20019936 Name of Scheme: Mdarbhari No. of Villages: 2 No. of Habitation Covered: 6
Total Population Covered: 5550 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 03-Aug-2023 Actual Date of Completion (Capex): 20-Dec-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 30.03/64.79 Mdarbhari 26º 26' 45.709" N 82º 18' 52.047" E
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 VTPump-1 45/42 Mdarbhari 26º 26' 45.709" N 82º 18' 52.047" E
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 RCC-ZAT 200 / 12 Mdarbhari 26º 26' 45.709" N 82º 18' 52.047" E
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI-K7 100 0.035
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 13.635
2 HDPE Pipe PN-6: Class PE-100 75 6.903
3 HDPE Pipe PN-6: Class PE-100 90 1.435
4 HDPE Pipe PN-6: Class PE-100 110 1.119
5 HDPE Pipe PN-6: Class PE-100 140 0.140
6 HDPE Pipe PN-6: Class PE-100 160 0.201
7 HDPE Pipe PN-6: Class PE-100 200 0.274
HSC Connection
Sno. Total Nos.
1 502
Other Details
289.05
0.00
280.94
20-Mar-2025
21-Mar-2025