Project Completion Certificate (Ground Water)
Scheme ID: 20019982 Name of Scheme: Muswi Khan pur Water Supply Scheme No. of Villages: 1 No. of Habitation Covered: 3
Total Population Covered: 1544 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 10-Feb-2024 Actual Date of Completion (Capex): 05-Apr-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tube Well 18M/130M Muswi Khanpur 29.568407 78.28398
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible Pump 7.5 HP 350 LPM /44 M Muswi Khanpur 29.568407 78.28398
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 100 KL /14 M Muswi Khanpur 29.568523 78.2838864
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI K-7 100 0.016
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE Pipe PN-6: Class PE-100 63 2.78
2 HDPE Pipe PN-6: Class PE-100 90 0.16
3 HDPE Pipe PN-6: Class PE-100 110 0.06
HSC Connection
Sno. Total Nos.
Other Details
1.44
1.44
1.44
14-Oct-2024
15-Oct-2024