Project Completion Certificate (Ground Water)
Scheme ID: 20020202 Name of Scheme: AMROLI URF BARAGOAN No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 4936 Base Year: 2023 Intermediate Year: 2038 Design Year: 2053
Date of Completion (As per Contract): 31-Dec-2024 Actual Date of Completion (Capex): 09-Dec-2023
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 39.03 Mtr / 103.24 Mtr AMROLI URF BARAGAON 29.171125 77.848715
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 950 LPM / 56 Mtr AMROLI URF BARAGAON 29.171125 77.848715
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 250 Kl / 18 M AMROLI URF BARAGAON 29.171125 77.848715
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.028
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.479
2 HDPE 90 0.612
3 HDPE 110 0.295
4 HDPE 125 0.314
HSC Connection
Sno. Total Nos.
1 952
Other Details
3.70
3.70
3.04
26-Apr-2024
17-Feb-2025