Project Completion Certificate (Ground Water)
Scheme ID: 20020246 Name of Scheme: SAMOLI SALEMPUR No. of Villages: 1 No. of Habitation Covered: 1
Total Population Covered: 5141 Base Year: 2022 Intermediate Year: 2037 Design Year: 2052
Date of Completion (As per Contract): 04-Feb-2024 Actual Date of Completion (Capex): 20-Sep-2024
Tubewells
Sno. Description Depth of Strainer (m) / Depth of Plain Pipe (m) Location Latitude Longitude
1 Tubewell 46.46 Mtr / 95.56 Mtr SAMOLI SALEMPUR 29.14057 77.740364
Pumps
Sno. Type of Pump Discharge (M³) / Head(Mtr.) Location Latitude Longitude
1 Submersible 1050 LPM / 56 Mtr SAMOLI SALEMPUR 29.14057 77.740364
OHT's
Sno. Structure Capacity (In KL) / Staging Ht.(Mtr.) Location Latitude Longitude
1 OHT 300 Kl / 18 M SAMOLI SALEMPUR 29.14057 77.740364
Clear Water Rising Main
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 DI 200 0.0265
Distribution Network
Sno. Pipe Type / Material Dia (In mm.) Length (In KM.) Remarks
1 HDPE 63 6.595
2 HDPE 90 0.428
3 HDPE 110 0.270
4 HDPE 125 0.246
5 HDPE 140 0.142
6 HDPE 160 0.234
7 HDPE 200 1.202
HSC Connection
Sno. Total Nos.
1 790
Other Details
3.85
3.85
3.13
06-Feb-2025
06-Apr-2025